As the site is prone to flooding, a series of floodgates were designed and installed to protect the basement floors
for menara ocbc building.
Key Features:
| Location | : | Menara OCBC building carpark entry & exit |
| Protection Coverage | : | 3.6mW x 1.7mH |
| Durable construction | : | High Pressure |
| Type | : | Top Swing |
| Material Design | : | Mild Steel & Stainless Steel |
| Sealing | : | 3 Sides |
| Operation | : | Automation Flood Control System Manual Override (Optional) |
Video of the KT Top Swing Floodgate
Floodgate at Menara OCBC
In this video, we take you through our floodgate demostrates the designed for high-pressure durability with sealing on three sides.